Marine Engineering - General, Ship Safety & Naval Architecture

ROTARY VANE STEERING GEAR

ROTARY VANE STEERING GEAR

 

Rotary vane steering gear

Rotary vane1

– Rotary vane steering gear is usually fitted with 3 fixed vanes and 3 moving vanes and can turn to 700 of total rudder movement i.e 350 on each side.

– Three fixed and three moving vanes are usual and permit a total rudder angle of 70’, i.e. 35° in each direction. The movement obtainable from a gear with two fixed and two moving vanes, may be 130°.

* The rotor C is fitted and keyed to a tapered rudder stock A, the stator B is secured to the ship’s structure. Fixed vanes, secured equidistantly in the stator bore and rotating vanes secured equidistantly in the rotor, form two sets of pressure chambers in the annular space between the rotor and stator.

* They are interconnected by a manifold. Fluid supplied at pressure to one set of these chambers will rotate C clockwise and the rudder will turn to port, or to starboard if the alternate set is put under pressure.

* The fixed and rotating vanes may be of spheroidal graphite cast iron. They are securely fixed to the cast steel rotor and stator by high tensile steel dowel pins and cap screws. Keys are also fitted along the length of the rotary vanes, for mechanical strength.

* Assembly of the gear would not be possible if the fixed vanes were keyed; they rely on the dowels to provide equivalent strength. The vanes fixing is considered to be of sufficient strength to make them suitable to act as rudder stops. Steel sealing strips, backed by synthetic rubber, are fitted in grooves along the working faces of the fixed and rotary vanes, thus ensuring a high volumetric efficiency, of 96—98% even at the relief valve pressure of 100 bar or over. Rotation of B is prevented by means of two anchor brackets, and two anchor pins. The anchor brackets are securely bolted to the ship.

* Vertical clearance is arranged between the inside of the stator flanges and the top and bottom of the anchor brackets to allow for vertical movement of the rudderstock. This clearance varies with each size of the rotary vane unit, but is approximately 38 mm in total and it is necessary that the rudder carrier should be capable of restricting the vertical movements of the rudderstock to less than this amount.

How the vanes are secured and the method of sealing the edges.

– All vanes are spheroidal graphite cast iron secured to the cast iron rotor and stator by high tensile steel dowel pins and cap screws.

– Keys are also fitted along the length of the rotary vanes, for mechanical strength. Assembly of the gear would not be possible if the fixed vanes were keyed; they rely on the dowels to provide equivalent strength. The vanes fixing is considered to be of sufficient strength to make them suitable to act as rudder stops.

– Steel sealing strips, backed by synthetic rubber, are fitted in grooves along the working faces of the fixed and rotary vanes, thus ensuring a high volumetric efficiency, of 96—98% even at the relief valve pressure of 100 bar or over.

 

Stator pressure chambers are usually duplicated.

The annular space between stator and rotor vanes are connected to two manifolds and form two sets of pressure chambers. Fluid supplied by the pump at a pressure to one set of these three chambers states the rudder in one direction and the fluid in the other set of three chambers squeezes out back to the pump.

State what considerations determine the number of vanes.

The rotary vane unit is normally fitted with three fixed and three moving vane, and permit a total rudder angle of 70° i.e. 35° in each direction. If larger rudder angle movement is required then only two fixed and two moving vanes will be used, which will permit an angular movement of the rudder of 130°. However the force on the vanes will have to be increased for the same torque as given by 3 vanes.

How the steering gear is locked for rudder maintenance.

Hydraulic Locking:

Isolating valves are provided at each cylinder or rotary vane chamber which when closed will hold the rudder by trapping the oil in the chambers. Isolating valves are also fitted to pumps so that a pump can be completely shut off from the circuit and removed for servicing while steering is continued with the other pump.

Mechanical Locking:

Usually the hexagon head of the steering gear is locked by placing a hexagon frame on it and locking it to the tiller. This method can be used as a secondary mean after locking it by hydraulic locking.

author-avatar

About Ram Govindasamy

Ram Govindasamy is a sailing marine engineer working for a leading cruise company. Ram founded Dieselship to create an online platform for Marine engineers worldwide to bond, share knowledge & Resources. He is a computer enthusiast who loves creating web based activities, web pages & programs. He is also authoring technical articles, videos for Dieselship as well as for various other maritime websites. Ram is interested in Maritime Law and Technical Operations and looks forward to meeting new people especially those who are interested in creating web based platforms, Assets maintenance & inventory programs and Planned Maintenance software etc

5 thoughts on “ROTARY VANE STEERING GEAR

  1. anivaryapumps says:

    really nice article,i highly appreciate your post.thanks for your guidance. this is really helpful guidance. your article is simple but informative . thanks for your article. waiting for your next post.

  2. Henryk Janeczek says:

    Thanks for essential info supplied in such short article. I found it very helpful and get information which i needed and could not find.

  3. NANOO PREMCHANDRAN says:

    Short Description of a Rotary Vane Steering Gear Failure on a Suez Max Vessel whilst crossing Suez Canal, Port Suez to Port Said direction, loaded with 125,000 MT Crude, which caused running aground of the Vessel in 1990.
    Steering failed & vessel run aground on sand bank. Whilst pulling out the Vessel with Tugs, aft of the vessel got run aground ion the opp side of the canal bank and Vessel was sitting on the sand bank by Aft & started swinging, which caused the Rudder stock to twist radially by 16 deg. Vessel pulled out by using few Tugs, forward & aft, after containing the oil pollution from #1 COT and brought back to Suez side of the Anchorage.
    Cargo was completely transferred to another Vessel by Salvage Party, Vessel was brought to Dubai Dry-Dock using Engine & steering the Vessel with 16 deg Off and escorted with a TUG.
    Running aground by Focsle, caused extensive damage to hull & iwo #1 COT across, causing Oil Pollution in the canal.
    At Dubai Dry-Dock, Focsle 7 #1 COT was completely fabricated, below the main Deck using 1500 MT of Steel in the Yard and attached after Cropping off the damaged part.
    Damaged Rudder Stock, removed shifted to W/S and stress relived by heating above 600 deg C over 24 hours, new Key way made & fitted back on temporary basis, with class conditions, as fabricating a New Rudder Stock was taking more than 6 months. The whole DD repair took about 3 months. After the repairs, the 1st full cargo of Crude loaded in Das Island for France via Cape.
    At dry dock, technician from the Makers attended the steering Gear and according to them it was a simple fault, the Oil Regulating Shuttle Valve was locked at Both the ends with CIRCLIPS & one of the the Circlip had slipped off, causing the the Shuttle valve to get Stuck at that Position, in turn which caused total Steering failure & run aground.
    This phenomenon was a reoccurring problem of the said make & hence the makers had modified the system. Even though the makers sent a circulars all concerned, but the said Vessel’s Owners were not aware, as the Vessel was laid up for about 20 years. Damage / Repair, claim was around 5 million USD, apart from Suez canal Authority’s Claim for 2 days Canal blockage & Clean-up of Oil Spillage.
    I replaced the C/E who was on board at SUEZ whilst the full Cargo was being transferred to another Vessel. and continued till 3 months repairs in Dubai Dry-Dock and two Cargo Loading / Discharging ( Persian Gulf to France Le-havre / West-Africa to Houston), 7 months on board.

  4. Çaptain Subrata Kumar Bose says:

    Well presented .

  5. Richard says:

    What if the steering gear is to be operated with hydraulic cylinders instead of an oil pump?