11 Feb2017 Marine Boilers Boiler Easing Gear 26 Aug 2020 By James Vincent 6 comments Boiler Easing Gear Why is it fitted? As per SOLAS chapter II-1 regulation 32 “Every steam boiler and every un-fired steam generator s... Continue reading
09 Feb2017 Management Total quality management 10 Feb 2017 By James Vincent 3 comments Total quality management Total quality management is a management technique which entails a continuous effort by the management as wel... Continue reading
13 Jan2017 Drydocking of Ships INSPECTION AFTER DOCKING THE SHIP IN DRYDOCK 12 Apr 2020 By Agaram K. Ramanujan 3 comments INSPECTION AFTER DOCKING THE SHIP IN DRYDOCK SCOPE OF DRY-DOCKING, INSPECTION AND REPAIR TO BE CARRIED OUT (1)BOTTOM INSPECTION AND C... Continue reading
13 Jan2017 Drydocking of Ships SAFE STABILITY CONDITION TO BE PROVIDED DURING DOCKING 14 Jan 2017 By Agaram K. Ramanujan 1 comment SAFE STABILITY CONDITION TO BE PROVIDED DURING DOCKING When docking the ship the ship is slightly trimmed by the stern so ... Continue reading
13 Jan2017 Drydocking of Ships VARIOUS SHIP PLANS REQUIRED BY SHIPYARD FOR DRY DOCKING 14 Jan 2017 By Agaram K. Ramanujan 3 comments VARIOUS SHIP PLANS REQUIRED BY SHIPYARD FOR DRY DOCKING VARIOUS SHIP PLANS REQUIRED FOR DRY DOCKING :- The following plans an... Continue reading
13 Jan2017 Drydocking of Ships WHAT IS DRY DOCK? NECESSITY OF DRY DOCKING 19 Apr 2021 By Agaram K. Ramanujan 2 comments WHAT IS DRY DOCK? NECESSITY OF DRY DOCKING - BY A.K.RAMANUJAN Reasons for dry-docking? Dry dock dry docking necessity. The dry d... Continue reading
11 Jan2017 Marine Engineering - General, Ship Safety & Naval Architecture Withdrawal of Propeller shaft, survey and assembly 12 Jan 2017 By Agaram K. Ramanujan 1 comment Withdrawal of Propeller shaft, survey and assembly propeller shaft Withdrawal,survey assembly propeller shaft Withdrawal,survey asse... Continue reading
09 Jan2017 Uncategorized Ship Windlass 12 Jan 2017 By Agaram K. Ramanujan 4 comments Ship Windlass WINDLASS Windlass seating:- The forces acting on the windlass when the ship is anchored is much more th... Continue reading
04 Dec2016 Featured, Ship Safety & Naval Architecture Load Line Regulations – A comprehensive guide 4 Dec 2016 By Agaram K. Ramanujan 2 comments Load Line Regulations INTRODUCTION The Load line regulations have a long history of over 140 years. They were introduced in the Briti... Continue reading
21 Sep2016 Marine Engineering - Motor Mechanical/Hydraulic Governors -Why fly weights are driven at a higher rotational speed than the engine? 21 Sep 2016 By Ram Govindasamy 1 comment Why fly weights are driven at a higher rotational speed than the engine? * Fly weight equipped governors work on centrifugal force... Continue reading
21 Sep2016 MMD Procedures How to transfer your files from Cochin MMD to Mumbai MMD 21 Sep 2016 By Ram Govindasamy 6 comments How to transfer your files from Cochin MMD to Mumbai MMD This procedure is almost same for transfer of files from one MMD to another M... Continue reading
28 Aug2016 MMD Procedures HOW TO APPLY FOR MEO CLASS II EXAM IN MMD MUMBAI 28 Aug 2016 By Ram Govindasamy 33 comments HOW TO APPLY FOR MEO CLASS II EXAM IN MMD MUMBAI Well, congratulations first of all for being ready and available to do your class II.... Continue reading