Q8. With respect to Bunkering operation onboard:
A) As Second Engineer of a new ship, prepare standing orders for all future bunkering operations onboard.
B. State why it is very important to obtain a representative sample of heavy fuel oil bunkered and State how a representative sample is obtained
Q5. Receiving of bunkers is an important aspect of a Senior Engineers responsibility, A. Stale the safety precautions that should be observed when bunkering; B. Explain the importance of taking samples when bunkering; C. Explain a preferred method of taking samples, D. State the effect of each in a fuel oil – i. High density; ii. High pour point; iii. High water content
Q5. If a small amount of oil is spilled during bunkering and causes a sheen upon the water, state what should be the procedure adopted for pollution control, information to authorities and subsequent bunkering practice.
Q6. As Second Engineer of a new ship,
a) Prepare standing orders for all future bunkering operations onboard. (7)
b) State why it is very important to obtain a representative sample of heavy fuel bunkers taken. (7)
c) Briefly discuss Marpol sample, In-use sample and on board Sample. (6)
Q7. A. As Second Engineer of a new ship, prepare standing orders for all future bunkering operations. (5)
B. State why it is very important to obtain a representative sample of heavy fuel bunkers taken and explain how a representative sample is obtained. (5)
C. What information is provided in bunker Delivery note (BDN). (5)
D. Requirement of designated sample points for taking in use bunker samples. (5)
Username or email address *Required
Password *Required
Note: Entering wrong username in the login form will ban your IP address immediately. Entering wrong password multiple times will also ban your IP address temporarily.
Log in
Lost your password? Remember me
No account yet?