Q1. (a) With a line diagram, explain the working of the Quick Closing Valve? (8)
(b) Why do you need the Quick Closing Valves on the fuel and lube oil lines? (3)
(c) Explain how to reset the valve after a trial. How is the periodic test carried out and what are the areas of concern that need special attention. (5)
Q2. (a) Sketch a line diagram showing a typical 'Inert Gas System' used for inerting the cargo tanks of oil tankers, labelling the component parts. (8)
(b) Describe the system. (8)
Q3. (a) With a diagram of the lubricating oil line, explain the working of an automatic backflushing filter placed on the lubricating oil line of the main engine. (10)
(b) List the main difference between such a filter and a centrifugal separator. (6)
Q4. (a) Describe TWO methods of tracing a superficial crack in a casting used as an engine component. (8)
(b) Explain how propagation of a crack in a machinery component can be arrested. (8)
Q5. (a) Discuss the use of non-metals onboard ships & name some of the common nonmetals used. (4)
(b) What are their areas of application on ships? (4)
(c) Name the advantages & also the limitations in using non-ferrous materials (8)
Q6. Write short notes to explain the following fittings/devices used in engine room, and their applications:
(a) Gear pump (5)
(b) Priming pump of Emergency fire pump (5)
(c) PID controller (6)
Q7. Write short notes on the following:
(a) Need for draining F. O. Services tanks regularly. (4)
(b) Need to ensure engine control room temperature is correctly maintained. (4)
(c) Need to ensure that service air is kept dry by all means. (4)
(d) To ensure that all guard rails are in place properly secured in the engine room. (4)
Q7. State the causes and remedial actions to be taken in case of the following detected on a reciprocating air compressor:
(a) Water mixed in the crankcase oil (4)
(b) LP safety valve blowing (4)
(c) Bursting disc rupture (4)
(d) Defective piston rings (4)
--- PREVIOUSLY ASKED AS ---
Q7. State the causes and remedial actions to be taken in case of the following occurring on an air compressor:
(d) Problems caused by detective piston rings (4)
Q9. a) Sketch the engine room bilge system line diagram indicating the valves and the pumps that are part of the bilge system of a bulk carrier. (6)
b) What could be probable reasons for the designated engine room bilge pump to be incapable of taking suction from the bilge well? (5)
c) What are the options available to you as the watchkeeping engineer if the bilge pump fails to cope up with the flooding of the engine room. (5)
Username or email address *Required
Password *Required
Note: Entering wrong username in the login form will ban your IP address immediately. Entering wrong password multiple times will also ban your IP address temporarily.
Log in
Lost your password? Remember me
No account yet?
DieselShip support
Send us a message and we'll reply by email, usually within one business day.
We've logged your ticket and sent a confirmation to your email.