Main S/W line cracked during sailing. As a second engineer how will you fabricate new pipe line ?

  • You must to post comments
0
0

In  order  not  to  delay  the  ship’s  sailing,  iwill  carry  out  a  temporary repair  by  bandaging  with  fibre  cloth  and  cardo bond  or  similar patented  repair  kit.

To  make  a  permanent  repair  at  the  arrival  port,  I  will  send  a  repair  specification  for  workshop  assistance  with   the  pipe  material  specification  .  since  it  is  sea  water  service  class C galvanised  steel  pipe  will  do. I  will  specify the  length  number  of  flanges  their  details  of  pitch  circle  ,  no  of  holes  and  their thickness  etc. I will  also  specify the  number  of  bends  required.  If  all  this  material  is  kept  ready  on  arrival,  the  permanent  repair  can be  completed  during  the  ship’s  stay  in  port.